This page describes the declaration and note sections included in the ZTITLOI command for drafting topographic drawings. It includes all necessary elements for titles, notes, building regulations and annotations.

Introduction

The ZTITLOI command (for inserting Title-Blocks) also contains 8 sections related to drafting Topographic drawings. You can add any additional elements you want to these sections.

Note: See the board creation procedure here.

Topographic sections

The 8 sections for drafting topographic drawings

^ Top of Page

Topographic Titles

Includes overall Title-blocks with note frames, building regulation frames, area calculation formulas, declarations and notes for common Topographic drawings inside and outside the Plan.

Topographic titles

Topographic titles and notes

^ Top of Page

Coordinate Systems

Coordinate System Reference notes placed in the top left corner of the Canvas (Local System, HATT, EGSA '87, UTM).

Reference systems

Coordinate and reference systems

^ Top of Page

Registration method

Registration details that must be included in the Notes if the Drawing is referenced (GPS, Traverse, Leveling...).

Topographic dependency

Topographic survey dependency elements

^ Top of Page

Frames & Tables

Includes:

  • Frame for inserting automated symbol and line notes. (Note: The frame already contains explanations for building classifications and open/closed balcony and roof that must appear in a frame.)
Topographic frames

Topographic frames and tables

^ Top of Page

Map excerpts

Includes the titles of common extracts that accompany Topographic drawings:

  • Map of larger area
  • Location map
  • Orthophoto map
  • Town plan
  • Cadastral map
  • Road map

Note: These titles are placed above the image of the extract.

Topographic extracts

Topographic extract titles

^ Top of Page

Building Regulations

Includes a frame for completing Building Regulations.

Building regulations

Building regulations frame

^ Top of Page

Surveyors certificates

Default certificate.

Declarations 651/77 outside

Declarations for topographic drawings outside plan

^ Top of Page

Statements and Notes

Default statements and notes:

  • Datum level notes
  • Qwnership statement
  • Surveyors statement
  • Altitude certificate
  • Forest map certificate
  • Land registry certificate
Declarations 651/77 inside

Declarations for topographic drawings inside plan

^ Top of Page

Miscellaneous

  • Area calculation formula
Miscellaneous elements

Various additional elements

^ Top of Page

Topographic Drafting Guide

Step-by-step Topographic drafting guide

Important Notes:

The ZTITLOI command contains 8 complete sections for drafting topographic drawings. You can customize and extend these sections according to your needs.

Tips:

Use the PDF guide for detailed step-by-step instructions on drafting topographic drawings.

Watch the available videos for visualization of the process.

Adjust frames and declarations according to the specific requirements of each project.

^ Top of Page